The New Colorado River Bridge at Hoover Dam

This article is currently only available in PDF format, please click the link to the top right.

About the author  ⁄ David Goodyear, P.E., S.E., P.Eng

David Goodyear is the Chief Bridge Engineer for T.Y. Lin International and was the Chief Engineer responsible for the design of the Sellwood Bridge Replacement Project. (david.goodyear@tylin.com)

Download this article
STRUCTURE magazine