As Easy As “ABC”

Accelerated Bridge Construction Techniques for Large Steel Orthotropic Deck Bridges

This article is currently only available in PDF format, please click the link to the top right.

About the author  ⁄ Carl Huang P.E.

Carl Huang, PE is a Senior Bridge Engineer with the California Department of Transportation (CALTRANS) and has more than 25-years with the State of California. Carl received a James F. Lincoln Arc Welding Foundation Award for his role as CALTRANS Contract Manager for the design of the Maritime Off-Ramp Orthotropic Bridge. Mr. Huang can be reached via email at Carl_Huang@dot.ca.gov.

Download this article
STRUCTURE magazine