Arapaho Road Bridge Blends Steel Arch with Prestressed Beams

This article is currently only available in PDF format, please click the link to the top right.

About the author  ⁄ Cliff R. Hall, P.E.

Cliff R. Hall, P.E. is a Vice President with URS Corporation in Dallas, Texas and was the project manager for the Arapaho Road Bridge. Mr. Hall serves as URS’ chief structural engineer for the Texas region.

Download this article
STRUCTURE magazine