The New Minneapolis I-35W Bridge

Designed and Built in Only 11 Months

This article is currently only available in PDF format, please click the link to the top right.

About the author  ⁄ Kevin Western, P.E.

Kevin Western, P.E. is the Assistant State Bridge Engineer for the Minnesota Department of Transportation. Kevin was MnDOT’s lead bridge engineer on the I-35W Bridge project, and was assigned to the project office on-site. He is a registered professional engineer in Minnesota.

Download this article
STRUCTURE magazine