Accelerated Bridge Construction Keeps Tappan Zee Bridge Open

This article is currently only available in PDF format, please click the link to the top right.

About the author  ⁄ Helena Tam, P.E.

Helena Tam, P.E. is a Project Engineer in HDR’s Manhattan office. She can be reached at helena.tam@hdrinc.com.

Download this article
STRUCTURE magazine