Rapid Replacement Oct, 2004 By Peter J. Smith In Articles, Product Watch Turning Overnight Bridge Replacement Upside Down This article is currently only available in PDF format, please click the link to the top right. About the author ⁄ Peter J. SmithMr. Smith is Vice President of Market Development and Product for The Fort Miller Co. Inc., Schuylerville, NY. Prev William H. Natcher Bridge Next Colossus Bridge Designer